Home Online Work New lane closure announced for EI bridge work | News

New lane closure announced for EI bridge work | News

19
0


EMERALD ISLE — Rehabilitation work on the Emerald Isle bridge continues, and the contractor will be adding a lane closure overnight.

Order Transcription Services

The contractor may now close one lane on the bridge between 6 p.m. and 6 a.m., through April 7. 

There will not be a lane closure April 8-24 for the Easter holiday. 

Then, between April 25-May 20, the contractor will restart an overnight lane closure between 9 p.m. and 6 a.m.

There will not be lane closures during the summer months; they will resume after Labor Day.

Already, NCDOT is allowed to have one lane of the bridge closed at any time from 9 a.m. to 3 p.m. weekdays and at any time on Saturday and Sunday. This does not guarantee the bridge will be closed during all those timeframes

NCDOT encourages drivers to plan for their travel when a lane closure is in place and remain alert while crews are working.

The latest round of work to repair the bridge began in late 2020, with a break during the 2021 tourism season.

The project is intended to extend the life of the bridge, which opened in 1971. The town has opposed widening it.

For real-time travel information, visit DriveNC.gov or follow NCDOT on social media.



Source link

LEAVE A REPLY

Please enter your comment!
Please enter your name here